Popcorn Ceiling Removal in Inglewood

Typical cost in Inglewood

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

A popcorn or other textured ceiling can only be judged by a lab, so we start with a test. If asbestos shows up, we remove the texture from the rooms you choose and hand the ceiling back for patching and paint.

Do not scrape, sand or sample the ceiling yourself. A certified consultant collects the sample, and the lab report tells us how big the job is.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, curtains and a sliding glass door looking onto trees

Ceiling jobs we take on

One room or the whole house

We can take the texture off one bedroom ceiling or every ceiling before a remodel. The lab report covers each ceiling that was sampled, so a ceiling that was not sampled is not covered.

Stained or patched texture

A water-stained or patched ceiling is tested like any other. The stain does not tell us what the material is, and only the lab result does.

Ceiling tiles and panels

Ceiling tiles and acoustic panels are different materials from sprayed texture, so each type gets its own sample and its own line in the report.

Leaving the ceiling alone

If your plan does not touch the ceiling, nothing has to come out. If the plan changes, call us before anyone starts and we will test first.

How the district sees a ceiling job

A ceiling job in a house is a renovation under the South Coast Air Quality Management District’s Rule 1403. The district’s notice rules do not apply to a renovation, in any type of building, where less than 100 square feet of asbestos-containing material is removed or stripped, though the work practices and waste rules still do. Demolition and larger renovations need a notice.

Waiting for the notice

The district wants its notice no later than 10 working days before the work begins. We handle the online filing, and your start date comes after that window, so allow at least 10 working days between filing and day one.

Patching and paint

Removal leaves the ceiling bare. Patching, new texture and paint are other trades, so book them ahead of our start date to avoid an unfinished room.

Empty room with clear plastic sheeting draped over the walls, ceiling and floor, wood floors and an orange air machine near the far windows

Nobody can tell from a glance whether a textured ceiling holds asbestos. Read asbestos testing and surveys first, and find our other jobs on the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 414-6846

Call (424) 414-6846